Some people explained it as Covid, but the work should start in 2021 at the latest. Paradoxically, the Meloni-Salvini government finally led to the construction of this track, and the previous technical government - Draghi did nothing in this direction. Although Draghi very often took pictures with athletes with medals. Salvini did at least 1 good thing in his political life If it wasn't for his last-minute about-face, the competition would probably be in Switzerland or Austria. I didn't believe in options with Cesana + Cortina is a better place for this track to continue operating in the future (better location + tradition in luge and bobsleigh sports).